Objectives
Task 4.1 Coordination and Communication
• Management and coordination of the Work Package, including monitoring of work progress, budget spending and
reporting to the project management.
• Organisation of WP meetings as well as meetings with other WPs and coordinating presentation of results within
AIDAinnova and to the detector community.
Task 4.2 Micro-beam upgrade at RBI accelerator facility
• Upgrade the RBI Accelerator Facility (RBI-AF) infrastructure for detector characterisation and radiation hardness
studies at micron-scales, including the upgrade of the motorised precision device positioning, cooling and data
acquisition systems
Task 4.3 Common tools for irradiation facilities quality control: data management, traceability, dosimetry and activation
measurements
• Generalise the IRRAD facility Data Manager (IDM) system to include new facilities (e.g., CERN GIF++, ENEA-
FNG) and improve the sharing of irradiation experiment results and operational data
• Produce a common dosimetry calibration set for cross-comparison of irradiation facilities
• Design and develop the prototype for an integrated system to manage induced activation (gamma spectrometry) and
traceability data for irradiated objects
Task 4.4 Design & development of a new sensor characterisation system based on the TPA-TCT technique
• Complete the development from the proof-of-concept installation towards a customisable user friendly Two-Photon
Absorption (TPA) Transient Current Technique (TCT) system with data acquisition and data analysis tools
• Support the evaluation of newly developed sensors (Low-Gain Avalanche Detectors and depleted CMOS devices)
developed in WP5 and WP6
• Offer support towards the implementation of similar systems in other European institutions
Task 4.5 Design & development of new electronics characterisation system for EMC control
• Design and develop an Electromagnetic Compatibility (EMC) test bench to measure the noise transfer function (TF)
curves of physics detectors
• Design and develop a portable test bench to perform in-situ EMC emission measurements of power supply unit in
irradiation facilities
Tasks
Task # | Task name | Task Leader |
---|---|---|
4.1 | Coordination and Communication | |
4.2 | Micro-beam upgrade at RBI accelerator facility | |
4.3 | Common tools for irradiation facilities quality control: data management, traceability, dosimetry and activation measurements |
|
4.4 | Design & development of a new sensor characterisation system based on the TPA-TCT technique | |
4.5 | Design & development of new electronics characterisation system for EMC control |
Milestones
MS # | Milestone name | Lead beneficiary | Due Date (in months) | Means verification |
---|---|---|---|---|
MS12 | Upgrade the RBI-AF infrastructure for detector characterisation, SEE, micro hardness testing | 4 - RBI | 23 | Accelerator runs and comparisons with test samples (Task 4.2) |
MS13 | Define requirements, global architecture and design the extended data management system for ENEA-FNG and CERN-GIF++ |
1 - CERN | 18 | Report (Task 4.3) |
MS14 | Extend IDM for ENEA- FNG, CERN-GIF++ and data communication with CAEN DigiWaste and CANBERRA Apex-Gamma Lab Platforms |
1 - CERN | 36 | Perform gamma measurements on tagged laboratory samples (Task 4.3) |
MS15 |
Test RFID tagging for irradiation facilities |
21 - INFN | 42 | Report, including measurements in different facilities (Task 4.3) |
MS16 |
Commission a complete TPA-TCT system |
31 - FYLA | 23 | TCT system 31 - FYLA 23 |
MS17 |
Apply TF test bench to FEE prototypes |
33 - ITAINNOVA | 23 | Report (Task 4.5) |
Deliverables
D # | Deliverable name | Lead beneficiary | Type | Due Date (in months) |
---|---|---|---|---|
D4.1 | Integrate the data acquisition and control system at RBI-AF | 4 - RBI | Report | 40 |
D4.2 | Evaluate Non-Ionizing Energy Loss (NIEL) of irradiation facilities with dedicated dosimeter structures | 1 - CERN | Report | 42 |
D4.3 | Deploy full prototype for irradiation facilities data management including sample tagging and spectrometry features | 18 - CAEN | Report | 45 |
D4.4 | Offer support towards the implementation of TPA-TCT systems and contribute to the evaluation of newly developed sensors technologies | 1 - CERN | Report | 46 |
D4.5 |
Develop a conductive noise test bench for irradiation facilities |
33 - ITAINNOVA | Demonstrator | 44 |