Milestones

Year 1

MS no.

Milestone name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

MS1Consortium Agreement signedWP11.1M1Achieved
MS4Launching of project websiteWP22.2M130/04/2021AchievedReport
MS3Open RI Innovation Coordination GroupWP11.3M630/09/2021AchievedReport
MS51Generic R&D projects selectedWP1313.1M801/02/2022AchievedConfidential
MS41Combined work plan with objectives and test definition for all technologiesWP1010.2M1107/03/2022AchievedReport
MS7Analysis of innovations needed in markets and technologiesWP22.4M1217/05/2022AchievedReport
MS18High granularity prototype fabrication 1WP55.2M1231/03/2022AchievedReport
MS32Test benches for testing detecting materials in picosecond and sub-picosecond domainsWP88.3M1231/03/2022AchievedReport
MS42Work plan taking also into account the detailed programme announced in MS10.1WP1010.3M1231/05/2022AchievedReport

Year 2

MS no.

Milestone name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

MS6Young Scientist Publication Committee establishedWP22.3M1530/06/2022AchievedReport
MS30Conceptual design and technical specifications of DAQ interfaces for highly granular electromagnetic and hadronic calorimetersWP88.2M1530/09/2022AchievedReport
MS33Design and test of scintillating tiles or strips with large active area suitable for large area detectorsWP88.3M1528/02/2023AchievedReport
MS44Plan of investigation and prototyping for development of mirrorless FSIWP1010.5M1530/10/2022AchievedReport
MS13Define requirements, global architecture and design the extended data management system for ENEA-FNG and CERN-GIF++WP44.3M1830/10/2022AchievedReport
MS22Wafer layoutWP66.2M1809/01/2023AchievedReport
MS24Completion of planar sensor production for ACFWP66.4M1830/10/2022AchievedReport
MS25Availability of parts and definition of the technologies for wafer to wafer hybridizationWP66.4M1809/01/2023AchievedReport
MS34Definition of SiPM requirements and performance studies with simulations of different use casesWP88.4M1831/01/2023AchievedReport
MS45Design review of 28 nm MPWWP1111.2M1807/02/2023AchievedReport
MS46Design review of 65/130 nm runWP1111.3M1920/12/2022AchievedReport
MS47LC reconstruction prototype in Key4hepWP1212.2M2119/01/2023AchievedReport
MS52Mid-term review of selected projectsWP1313.2M2120/02/2023AchievedReport
MS37Status report on chimneysWP99.3M2225/05/2023AchievedReport
MS40Large-scale WLS surfaces and SiPMs TestedWP99.4M2225/05/2023AchievedReport
MS43Mid-time report detailing the new experimental facility and results from the theoretical studiesWP1010.4M2231/01/2023AchievedReport
MS48Prototype of ML based shower simulationWP1212.3M2224/01/2023AchievedReport
MS11Common read-out boards designedWP33.5M2328/02/2023AchievedReport
MS12Upgrade the RBI-AF infrastructure for detector characterisation, SEE, micro hardness testingWP44.2M2328/02/2023AchievedReport
MS16Commission a complete TPA-TCT systemWP44.4M2315/04/2023AchievedReport
MS17Apply TF test bench to FEE prototypesWP44.5M2328/02/2023AchievedReport
MS20Radiation hard prototype fabricationWP55.3M2328/04/2023AchievedReport
MS23Preliminary characterisation of 3D and LGAD prototypes. Test set-up ready in the laboratoriesWP66.3M2301/05/2023AchievedReport
MS26Production of DLC with ion beam deposition and pulsed laser depositionWP77.3M2328/02/2023AchievedReport
MS31Design and simulation of LAr read-out electrodeWP88.2M2330/03/2023AchievedReport
MS35Definition of the assembly method and of the ASIC specifications for a dual read-out calorimeterWP88.4M2328/02/2023AchievedReport
MS36Pixel optimisation WP99.2M2328/06/2023AchievedReport
MS38Status report on CRPsWP99.3M2330/06/2023AchievedReport
MS49Acts tracking algorithm prototypesWP1212.4M2328/02/2023AchievedReport
MS50New PFA prototypesWP1212.5M2328/02/2023AchievedReport
MS5Academia Meets Industry SymposiumWP22.2M2430/06/2023AchievedReport

Year 3

MS no.

Milestone name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

MS8Telescopes upgraded with ALPIDE sensorWP33.2M2725/01/2025AchievedReport
MS10Monitoring software developedWP33.4M3030/09/2023AchievedReport
MS39Status report on digitisationWP99.3M3301/03/2024AchievedReport
MS9Timepix4 timing layer in telescopesWP33.3M3630/09/2024AchievedReport
MS14Extend IDM for ENEA-FNG, CERN-GIF++ and data communication with CAEN DigiWaste and CANBERRA Apex-Gamma Lab PlatformsWP44.3M3606/02/2024AchievedReport
MS19High granularity prototype fabrication 2WP55.2M3606/05/2024AchievedReport
MS27Build a 0.3×0.3 m2 prototype and the read-out plane with the new structureWP77.3M3625/09/2024AchievedReport
MS28Identification of a gas mixture for neutrino physics in an optical TPCWP77.4M3609/04/2024AchievedReport

Year 4

MS no.

Milestone name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

MS15Test RFID tagging for irradiation facilitiesWP44.3M4230/09/2024AchievedReport
MS21Test beam of the radiation hard monolithic pixel 1WP55.3M4225/11/2024AchievedReport
MS29Design electronics for cluster counting and production of a 4-channel prototype WP77.4M4617/02/2025AchievedReport