Deliverables

Year 1

Del no.

Deliverable name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

D2.1 Presentation video WP2 2.2 M3 25/02/2022 Achieved Report
D14.1 POPD-Requirement No. 1 WP14 N/A M6 30/09/2021 Achieved Confidential
D14.2 EPQ-Requirement No. 2 WP14 N/A M6 14/12/2021 Achieved Confidential

Year 2

Del no.

Deliverable name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

D1.1 European Roadmap for Detector R&D WP1 1.2 M18 30/11/2022 Achieved Report
D5.1 Report on performance of high granularity DMAPS Version 1 WP5 5.2 M22 31/05/2023 Achieved Report
D11.1 MPW 28 nm WP11 11.2 M22 31/07/2024 Achieved Report
D11.2 MPW 65/130 nm WP11 11.3 M23 14/05/2024 Achieved Report

Year 3

Del no.

Deliverable name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

D3.1 Common cold box delivered WP3 3.2 M30 30/03/2025

Achieved

Report
D6.1 Completion of common productions WP6 6.2 M30

Delayed

Justification for delay
D7.3 Production with industry of small-size of μ-RWELLs WP7 7.3 M30 22/12/2023 Achieved Report
D8.2 Report on prototypes construction, performance and assessment of industrialisation WP8 8.3 M35  26/04/2024 Achieved Report
D5.3 Report on performance of radiation-hard DMPAS WP5 5.3 M36 30/04/2024 Achieved Report
D7.1 Characterisation of small size MRPC prototypes for fast timing and high rates WP7 7.2 M36 26/04/2024 Achieved Report
D8.1 Demonstrator of a combined read-out system of highly granular electromagnetic and hadronic calorimeters WP8 8.2 M36

Delayed

Justification for delay

Year 4

Del no.

Deliverable name

WP

Task

Planned delivery date

Actual delivery date

Status

Comments

D3.2 New TLU produced WP3 3.3 M39 03/06/2025

Achieved

Report
D3.4 New software developments available for use WP3 3.4 M39 30/06/2024 Achieved Report
D4.1 Integrate the data acquisition and control system at RBI-AF WP4 4.2 M40 31/07/2024 Achieved Report
D3.5 Common read-out boards delivered  WP3 3.5 M42 30/09/2024 Achieved Report
D4.2 Evaluate Non-Ionizing Energy Loss (NIEL) of irradiation facilities with dedicated dosimeter structures WP4 4.3 M42  

Achieved

Report
D11.3 Measurement reports  WP11

11.2

11.3

M42 31/01/2025 Achieved Report
D10.2 Hydraulic interconnection technologies WP10 10.3 M43 31/05/2025 Achieved Report
D12.3 Acts tracking algorithms WP12 12.4 M43 05/11/2024 Achieved Report
D4.5 Develop a conductive noise test bench for irradiation facilities WP4 4.5 M44 23/06/2025 Achieved Report
D5.2 Report on performance of high granularity  DMAPS Version 2 WP5 5.2 M44 28/07/2025 Achieved Report
D6.3 Test of the final ultra-thin hybrid assemblies from wafer-to-wafer bonding WP6 6.4 M44      
D7.5 Small-size prototype of a MPGD single photon detector for compact RICHs WP7 7.5 M44 29/11/2024 Achieved Report
D8.3 Qualification of neutron irradiated SiPMs at different temperatures WP8 8.4 M44  

Delayed

Justification for delay
D9.1 Large-scale Pixel Anode WP9 9.2 M44 15/03/2025 Achieved Report
D10.3 Supercritical CO2 as a refrigerant  WP10 10.4 M44 14/04/2025 Achieved Report
D4.3 Deploy full prototype for irradiation facilities data management including sample tagging and spectrometry features WP4 4.3 M45

12/08/2025

Achieved Report
D6.4 Validation of ACF for large and small pitch assemblies WP6 6.4 M45 01/03/2025 Achieved Report
D7.2 Validation of the eco-friendly gas mixtures for RPCs at GIF++ WP7 7.2 M45 01/03/2025 Achieved Report
D9.3 R&D in LAr optical read-out WP9 9.4 M45      
D10.4 Upgraded FSI WP10 10.5 M45   Achieved Report
D12.2 Fast shower simulation in Geant4 WP12 12.3 M45 20/12/2024 Achieved Report
D12.4 PFA reconstruction algorithms WP12 12.5 M45 20/12/2024 Achieved Report
D3.3 Telescopes upgraded with new layers WP3

3.2

3.3

M46 04/03/2025 Achieved Report
D4.4 Offer support towards the implementation of TPA-TCT systems and contribute to the evaluation of newly developed sensors technologies WP4 4.4 M46 05/04/2025 Achieved Report
D5.4 Report of beam tests of irradiated radiation-hard DMPAS WP5 5.3 M46  15/07/2025 Achieved Report
D6.2 Final validation of timing performance of common productions WP6 6.3 M46
D7.4 A small-scale TPC prototype (#10 1) with hybrid charge/optical read-out and a hydrogen rich gas mixture with high scintillation yield WP7 7.4 M46 15/03/2025 Achieved Report
D8.4 Construction and qualification with beam of 10x10 cm^2, 2 m long, prototypes WP8 8.4 M46 15/03/2025 Achieved Report
D9.2 Vertical Drift chimneys, digitisation, CRPs WP9 9.3 M46 15/03/2025 Achieved Report
D10.1 Cooling device demonstrators  WP10 10.2 M46
D12.1 Turnkey software stack (Key4hep) WP12 12.2 M46 30/01/2025 Achieved Report
D13.1 Summary report of generic R&D projects and evaluation of the approach WP13 13.2 M46
D2.3 Final report on career actions of young scientists WP2 2.3 M47 30/09/2025 Achieved Report
D2.2 Report on Communication, Dissemination and Outreach WP2 2.2 M48 30/09/2025 Achieved Report
D2.4 Impact analysis WP2 2.4 M48 30/09/2025 Achieved Report
D13.2 Summary report of generic R&D projects and evaluation of the approach eXflu-innova project WP13 13.2 M50 29/05/2025 Achieved Report
D13.3 Summary of the SiEM project WP13 13.3 M50 03/06/2025 Achieved Report
D13.4 Summary report of R&D project: development of fine sampling calorimeters with nanocomposite scintillating Materials ( NANOCAL) WP13 13.4 M47 29/05/2025 Achieved Report
D13.5 Summary report of generic R&D projects and evaluation of the approach. The WADAPT project.  WP13 13.5 M46 26/05/2025 Achieved Report