Year 1
Del no. |
Deliverable name |
WP |
Task |
Planned delivery date |
Actual delivery date |
Status |
Comments |
---|---|---|---|---|---|---|---|
D2.1 | Presentation video | WP2 | 2.2 | M3 | 25/02/2022 | Achieved | Report |
D14.1 | POPD-Requirement No. 1 | WP14 | N/A | M6 | 30/09/2021 | Achieved | Confidential |
D14.2 | EPQ-Requirement No. 2 | WP14 | N/A | M6 | 14/12/2021 | Achieved | Confidential |
Year 2
Del no. |
Deliverable name |
WP |
Task |
Planned delivery date |
Actual delivery date |
Status |
Comments |
---|---|---|---|---|---|---|---|
D1.1 | European Roadmap for Detector R&D | WP1 | 1.2 | M18 | 30/11/2022 | Achieved | Report |
D5.1 | Report on performance of high granularity DMAPS Version 1 | WP5 | 5.2 | M22 | 31/05/2023 | Achieved | Report |
D11.1 | MPW 28 nm | WP11 | 11.2 | M22 | 31/07/2024 | Achieved | Report |
D11.2 | MPW 65/130 nm | WP11 | 11.3 | M23 | 14/05/2024 | Achieved | Report |
Year 3
Del no. |
Deliverable name |
WP |
Task |
Planned delivery date |
Actual delivery date |
Status |
Comments |
---|---|---|---|---|---|---|---|
D3.1 | Common cold box delivered | WP3 | 3.2 | M30 | Delayed | Justification for delay | |
D6.1 | Completion of common productions | WP6 | 6.2 | M30 | Delayed | Justification for delay | |
D7.3 | Production with industry of small-size of μ-RWELLs | WP7 | 7.3 | M30 | 22/12/2023 | Achieved | Report |
D8.2 | Report on prototypes construction, performance and assessment of industrialisation | WP8 | 8.3 | M35 | 26/04/2024 | Achieved | Report |
D5.3 | Report on performance of radiation-hard DMPAS | WP5 | 5.3 | M36 | 30/04/2024 | Achieved | Report |
D7.1 | Characterisation of small size MRPC prototypes for fast timing and high rates | WP7 | 7.2 | M36 | 26/04/2024 | Achieved | Report |
D8.1 | Demonstrator of a combined read-out system of highly granular electromagnetic and hadronic calorimeters | WP8 | 8.2 | M36 | Delayed | Justification for delay |
Year 4
Del no. |
Deliverable name |
WP |
Task |
Planned delivery date |
Actual delivery date |
Status |
Comments |
---|---|---|---|---|---|---|---|
D3.2 | New TLU produced | WP3 | 3.3 | M39 | Delayed | Justification for delay | |
D3.4 | New software developments available for use | WP3 | 3.4 | M39 | 30/06/2024 | Achieved | Report |
D4.1 | Integrate the data acquisition and control system at RBI-AF | WP4 | 4.2 | M40 | 31/07/2024 | Achieved | Report |
D3.5 | Common read-out boards delivered | WP3 | 3.5 | M42 | |||
D4.2 | Evaluate Non-Ionizing Energy Loss (NIEL) of irradiation facilities with dedicated dosimeter structures | WP4 | 4.3 | M42 | |||
D11.3 | Measurement reports | WP11 |
11.2 11.3 |
M42 | |||
D10.2 | Hydraulic interconnection technologies | WP10 | 10.3 | M43 | |||
D12.3 | Acts tracking algorithms | WP12 | 12.4 | M43 | |||
D4.5 | Develop a conductive noise test bench for irradiation facilities | WP4 | 4.5 | M44 | |||
D5.2 | Report on performance of high granularity DMAPS Version 2 | WP5 | 5.2 | M44 | |||
D6.3 | Test of the final ultra-thin hybrid assemblies from wafer-to-wafer bonding | WP6 | 6.4 | M44 | |||
D7.5 | Small-size prototype of a MPGD single photon detector for compact RICHs | WP7 | 7.5 | M44 | |||
D8.3 | Qualification of neutron irradiated SiPMs at different temperatures | WP8 | 8.4 | M44 | Delayed | Justification for delay | |
D9.1 | Large-scale Pixel Anode | WP9 | 9.2 | M44 | |||
D10.3 | Supercritical CO2 as a refrigerant | WP10 | 10.4 | M44 | |||
D4.3 | Deploy full prototype for irradiation facilities data management including sample tagging and spectrometry features | WP4 | 4.3 | M45 | |||
D6.4 | Validation of ACF for large and small pitch assemblies | WP6 | 6.4 | M45 | |||
D7.2 | Validation of the eco-friendly gas mixtures for RPCs at GIF++ | WP7 | 7.2 | M45 | |||
D9.3 | R&D in LAr optical read-out | WP9 | 9.4 | M45 | |||
D10.4 | Upgraded FSI | WP10 | 10.5 | M45 | |||
D12.2 | Fast shower simulation in Geant4 | WP12 | 12.3 | M45 | |||
D12.4 | PFA reconstruction algorithms | WP12 | 12.5 | M45 | |||
D3.3 | Telescopes upgraded with new layers | WP3 |
3.2 3.3 |
M46 | |||
D4.4 | Offer support towards the implementation of TPA-TCT systems and contribute to the evaluation of newly developed sensors technologies | WP4 | 4.4 | M46 | |||
D5.4 | Report of beam tests of irradiated radiation-hard DMPAS | WP5 | 5.3 | M46 | |||
D6.2 | Final validation of timing performance of common productions | WP6 | 6.3 | M46 | |||
D7.4 | A small-scale TPC prototype (#10 1) with hybrid charge/optical read-out and a hydrogen rich gas mixture with high scintillation yield | WP7 | 7.4 | M46 | |||
D8.4 | Construction and qualification with beam of 10x10 cm^2, 2 m long, prototypes | WP8 | 8.4 | M46 | |||
D9.2 | Vertical Drift chimneys, digitisation, CRPs | WP9 | 9.3 | M46 | |||
D10.1 | Cooling device demonstrators | WP10 | 10.2 | M46 | |||
D12.1 | Turnkey software stack (Key4hep) | WP12 | 12.2 | M46 | |||
D13.1 | Summary report of generic R&D projects and evaluation of the approach | WP13 | 13.2 | M46 | |||
D2.3 | Final report on career actions of young scientists | WP2 | 2.3 | M47 | |||
D2.2 | Report on Communication, Dissemination and Outreach | WP2 | 2.2 | M48 | |||
D2.4 | Impact analysis | WP2 | 2.4 | M48 |